CONVIBA - Pilot Projects in Austria
Pilot project in Vienna
The building
The elementary school „Paulusgasse 9-11, 1030 Vienna“ has been chosen as the pilot project in Vienna
Technical data of the building, building data sheet in German (pdf, 8 kB)
The procurement procedure
Within the pilot project several possible procurement procedures have been proved concerning their usability for energy performance contracting. Following procedures has been surveyed in detail:
Design contest with public notice of contest & negotiated procedure
At this procedure after the finish of the design contest the implementation of the measures must be put out to tender. Therewith planning, implementation and maintenance can be in different sources, what can be a big disadvantage for a contracting project.
Graphic model “Design contest and negotiated procedure” (pdf, 7 kB)
Negotiated procedure with prior notification
Within the negotiated procedure the proposed measures can be discussed and optimised together with the building owner. The winner of the negotiated procedure is implementing his own concept for measures. Therewith planning, implementation and maintenance is in one source. This procedure has been chosen for the Viennese pilot project.
Graphic model „Negotiated procedure with prior notification“ (pdf, 9 kB)
Open procedure
At this procedure an unlimited number of companies can submit an offer. There is no pre-selection of candidates and no negotiated procedure.
Graphic model „Open procedure“ (pdf, 4 kB)
Notification of the procurement of the pilot project
The notification of the procurement has been published at the 25. 9. 2003 in the official journal „Wiener Amtsblatt“ as well as at the internet website of the City of Vienna.
Text of the notification (pdf, 7 kB)
Additional all known Contractors in Austria has been informed by e-mail about the public procurement.
At the internet website of the City of Vienna a form sheet for candidates to apply for participation in the call for tenders as well as further information regarding the building can be downloaded.
Photo documentation of the building (pdf, 682 kB)
Application for participation in the call for tenders
Companies which want to participate in the call for tenders have to fill out a form sheet.
Application form sheet (pdf, 35 kB)
Criteria for qualitative selection and selection criteria of Candidates
In a first phase candidates has been proved by criteria for qualitative selection criteria for qualitative selection. The number of candidates invited to submit a tender has been limited by 10. In event of more than 10 candidates fulfil the criteria for qualitative selection, the best of them are selected using the selection criteria selection criteria.
Criteria for qualitative selection (pdf, 12 kB)
Criteria selection criteria (pdf, 9 kB)
Bidding documents
The bidding documents has been sent to the selected candidates at the beginning of November 2003.
Criteria for the selection of the best tender (Zuschlagskriterien)
The tenders has been evaluated using the „criteria for the selection of the best tenders“.
Zuschlagskriterien (pdf, 10 kB)
Visitation of the building
At the beginning of November 2004 all candidates invited to submit a tender got the possibility for separately visitation of the building to survey the condition of the building, the energy systems, the saving potentials and the user behaviour. These information, which has been acquired during the visitation has been summarised and sent to all candidates.
Summerize of the information acquired at the visitation (pdf, 8 kB)
During the visitation candidates had the opportunity to do photos of the building facilities.
![]()
The candidate's visitation of the building
Negotiation with the tenderer
After the submission of the tenders negotiations has been conducted with all tenderer separately. At this negotiations technical details of the offer have been discussed and the building owner could do suggestion for optimising the technical concept. All these negotiations have been recorded in writing.
After the negotiations all tenderer got a list of measures, which are preferable by the building owner. Based on this list all tenderer had the opportunity to add their offer.
The following graphs show the results of the best three offers before and after the negotiation process.
The winner project
of the Contracting procurement for the school Paulusgasse, 1030 Vienna
Winner: Company
VA TECH ELIN EBG GmbH & Co
Serravagasse 10, A - 1140 Wien
Kontakt: Ing. Bernd Stampfl, Tel.: +43 1 89990-2200
Technical measures for energy saving
Improvements at the temperature control (single room temperature control), condensing boiler, measures at the hydraulic system, user motivation
| Specific energy demand for heating and hot water per floor space before the Contracting measures | 148 kWh/m² | |
| Guaranteed specific energy demand for heating and hot water per floor space after the Contracting measures | 80 kWh/m² | |
| Energy demand of the building before the Contracting measures (reference value) | natural gas: electricity: total: |
564,97 MWh/a 55,21 MWh/a 620,15 MWh/a |
| Energy demand of the building after the Contracting measures | natural gas: electricity: total: |
286,87 MWh/a 49,14 MWh/a 336,01 MWh/a |
| Guaranteed energy savings in MWh/a | natural gas: electricity: total: |
278,10 MWh/a 6,07 MWh/a 284,17 MWh/a |
| Guaranteed energy savings in % of the energy demand (sum of all energy carrier) | 45,8 % |
|
| Sum of the contract (sum of all costs of the Contractor) | 133.140,-- Euro | |
| Contract duration | 12 years | |
| Yearly energy cost savings | 11.095,-- Euro/a | |
| Capital value a) for the building owner City of Vienna | 62.746,-- Euro | |
a) The capital value is calculated by the sum of all costs and savings of the building owner within a period of 20 years. All figures are discounted toward the year of the investment. The capital value considers the energy cost savings, the costs of necessary reinvestments and service and maintenance after the contract duration as well as the residual value of the facilities and structural measures at the end of the 20 years period.
![]()
Annual energy costs and pay back rates
Österreichische Gesellschaft
für Umwelt und Technik
Hollandstraße 10/46
A-1020 Wien
Tel +43.1.315 63 93
Fax +43.1.315 63 93-22
E-Mail office@oegut.at
Further Information
Contact
For further information please contact
DI Gerhard Bayer
Tel.: 0043.1.315 63 93-16
E-mail: gerhard.bayer@oegut.at

